Optical structures having integrated component layers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9874961
SERIAL NO

14897035

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of forming an optical structure in a continuous manufacturing process includes providing a continuous ribbon of flexible glass substrate (134) having a thickness of no more than 0.3 mm. The continuous ribbon of flexible glass substrate has a first side and a second side separated by a plane formed by the ribbon of flexible glass substrate. A liquid polarizer material (142) is applied on the ribbon of flexible glass substrate at one of the first and second sides as the continuous ribbon of flexible glass substrate moves by a polarizer material application apparatus to form a polarizing layer. A conductive material (150) is applied on the ribbon of flexible glass substrate at one of the first and second sides to form a touch layer for a touch sensitive display.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CORNING INCORPORATEDSP-TI-03-1 CORNING NY 14831

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chaturvedi, Ashish Hersh Painted Post, US 1 6
Ishikawa, Tomohiro Corning, US 68 1085
Tian, Lili Laurel, US 18 102

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00