Multi-functional fuel cable

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9876240
SERIAL NO

14246863

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a connector or cable between the fuel supply and the fuel cell that in addition to transporting fuel and electrical power can also communicate control signals between the fuel cell and the cartridge to instruct the fuel cartridge or the fuel cell or both to commence or cease the operation of one or more functions. Control signals can be electrical, fluidic/hydraulic and/or mechanical. The connector or cable may also transport electricity produced by the fuel cell to power an electronic device, and/or to the fuel cartridge to power a component(s) on the cartridge or to re-charge a battery. The connector or cable may have universal connectors that can attach to multiple fuel cells, fuel cartridges and electronic devices, even when manufactured by different manufacturers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTELLIGENT ENERGY LIMITEDCHARNWOOD BUILDING HOLYWELL PARK ASHBY ROAD LOUGHBOROUGH LEICESTERSHIRE LE11 3GB

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Curello, Andrew J Hamden, US 86 1305
Iaconis, Jean-Louis Burnaby, CA 32 311
MacDonald, Aaron Joseph North Vancouver, CA 5 24
McLean, Gerard F West Vancouver, CA 56 461
Sturm, Sven North Vancouver, CA 4 69

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00