Solid electrolyte, method for manufacturing solid electrolyte, solid electrolyte laminate, method for manufacturing solid electrolyte laminate, and fuel cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9876248
SERIAL NO

14387639

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a solid electrolyte made of yttrium-doped barium zirconate having hydrogen ion conductivity, a doped amount of yttrium being 15 mol % to 20 mol %, and a rate of increase in lattice constant at 100° C. to 1000° C. with respect to temperature changes being substantially constant. Also provided is a method for manufacturing the solid electrolyte. This solid electrolyte can be formed as a thin film, and a solid electrolyte laminate can be obtained by laminating electrode layers on this solid electrolyte. This solid electrolyte can be applied to an intermediate temperature operating fuel cell.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KYOTO UNIVERSITY;SUMITOMO ELECTRIC INDUSTRIES, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Han, Donglin Kyoto, JP 6 11
Hiraiwa, Chihiro Itami, JP 59 150
Kuramitsu, Akiko Kyoto, JP 1 4
Majima, Masatoshi Itami, JP 165 457
Mizuhara, Naho Itami, JP 59 223
Uda, Tetsuya Kyoto, JP 40 219
Yamaguchi, Atsushi Itami, JP 346 2217

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00