Manufacturing method for grinding wheel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9878426
SERIAL NO

14921252

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a grinding wheel which is formed by fitting a cylindrical grindstone chip including abrasive grains to a base metal formed to be of a columnar shape, comprises an adhesive agent applying step, a linear guide member arranging step for arranging and attaching a plurality of linear guide members on at least one of the outer peripheral surface of the base metal and the inner peripheral surface of the cylindrical grindstone chip, in parallel with a rotation axis of the base metal and with an equal distance separated in a circumferential direction from one another and a base metal and grindstone chip fitting step for fitting the base metal and the cylindrical grindstone chip to each other by relatively moving the base metal and the cylindrical grindstone chip, interposing therebetween the plurality of linear guide members arranged and attached with the equal distance separated from one another.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYODA VAN MOPPES LTD1-54 AZA SHIROYAMA MAIGI-CHO OKAZAKI-SHI AICHI 444-3594

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kojima, Takashi Okazaki, JP 231 1691
Kono, Takuma Okazaki, JP 3 4
Masuda, Takumi Okazaki, JP 9 27
Mizuno, Motohiro Okazaki, JP 10 156

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00