Method for preparing composite structures and consumable assembly therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9878503
SERIAL NO

14422839

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, a consumable assembly, and a tool for preparing a composite structure from a laminate disposed on a surface of a mold. The method involves preparing consumable materials, such as a breather sheet and a vacuum bag, and preparing an inflatable tool, outside of the mold. These prepared consumable materials and the inflatable tool are then inserted into the mold, and the inflatable tool is inserted into a folded assembly of the breather and vacuum bag. Once inserted into the mold, the inflatable tool is inflated, which deploys the consumable materials against the laminate. A vacuum can be generated, which maintains the deployed consumable materials against the laminate. This can be done for many hours. Finally, the laminate is cured inside the mold so as to form the composite structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOMBARDIER INCDORVAL QUÉBEC H4S 1Y9

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
André, Jacques Saint-Jerome, CA 1 1
Charbonneau, Alain Blainville, CA 1 1
Ferland, Jérôme Sainte-Pétronille, CA 1 1
Therien, Royal St-Stanislas de Kostka, CA 1 1
Urbiola, Jose Alberto Queretaro, MX 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00