Variable displacement vane pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9879670
APP PUB NO 20160010642A1
SERIAL NO

14766525

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vane pump includes a rotor, vanes, pump chambers, a suction port, and a discharge port. The side member has a first transition section and a second transition section. The first transition section is a section from an end point of the suction port to a start point of the discharge port. The second transition section is a section from an end point of the discharge port to a start point of the suction port. An angle between the start point and the end point of the suction port is set such that a pressurizing timing is offset from a depressurizing timing. The pressurizing timing is a timing at which one pump chamber starts to communicate with the discharge port from the first transition section, and the depressurizing timing is a timing at which another pump chamber starts to communicate with the suction port from the second transition section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KYB CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akatsuka, Koichiro Gifu, JP 30 115
Fujita, Tomoyuki Gifu, JP 80 370
Kato, Fumiyasu Aichi, JP 15 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00