Fuel and a fuel burning system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9879854
SERIAL NO

14070300

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of fueling a flame, a fuel, and a fuel burning system is provided. The system has a melted wax reservoir, a fuel, a melting grate, and a wick. The fuel has a body, a priming section, a front wall, and a bottom surface. The priming section is vertically spaced from the bottom surface and extending from the front wall to create an overhang. The priming section extends along less than the entire length of the front wall. The melting grate is configured to support the fuel. The melting grate extends above the melted wax reservoir so that fuel melted on the melting grate can be received into the melted wax reservoir. The wick has an at least partially hollow core forming a burn chamber extending above the melting grate. The fuel is configured to be positioned so the overhang is located over or adjacent to the wick.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MASTERSON ENTERPRISES INCADDISON IL 60101

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Masterson, Daniel J Geneva, US 14 104
Surati, Dipan Des Plaines, US 9 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00