Natural gas isobaric liquefaction apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9879905
SERIAL NO

14763760

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention is about a natural gas isobaric liquefaction apparatus, which is based on the Rankine cycle system of similar thermal energy power circulation apparatus at cryogenic side, a cryogenic liquid pump is used to input power and the refrigerating media makes up cold to the natural gas liquefying apparatus, so as to realize the isobaric liquefaction of natural gas. The natural gas liquefying apparatus of this invention can save energy by over 30% as compared with the traditional advanced apparatus with the identical refrigerating capacity, therefore it constitutes a breakthrough to the traditional natural gas liquefaction technology, with substantial economic, social and environmental protection benefits.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANJING RECLAIMER ENVIRONMENTAL TEKNIK CO LTDROOM 301 ZONE A JIANGNING E-COMMERCE INDUSTRIAL PARK JIANGNING DISTRICT NANJING CITY JIANGSU PROVINCE 211100 NANJING CITY JIANGSU PROVINCE 211100

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Haibo Jiangsu, CN 251 710

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00