Method and plant for carrying out thermal treatments of braking elements, in particular brake pads

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9879913
SERIAL NO

14782113

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and plant for thermally treating braking elements after a forming step, including a convective heating step at 150-300° C. and a infrared irradiation heating step, immediately in succession one relative to the other. A tunnel convection furnace is crossed by at least a first conveyor belt which translates along a first direction and on an upper face of which the braking elements are placed, is arranged laterally adjacent, with respect to the first direction, to an infrared heating tunnel furnace crossed by a second conveyor belt which translates along a second direction, parallel and opposite to the first one, and on an upper face of which the braking elements are placed. The first conveyor belt is larger than the second conveyor belt, and the braking elements appear in multiple side-by-side rows in a transverse and oblique direction with respect to the first and second directions. Robots placed at the opposite ends of the furnaces transfer the braking elements from the first conveyor belt to the second one or vice versa to a first end of the furnaces and place them on the first conveyor belt or second one to a second end of the furnaces being opposite to the first one, so as to change at will the sequence in which the infrared and convective heating steps are performed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ITT ITALIA S R L20020 LAINATE (MI)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
De, Dominicis Sandro Barge, IT 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00