Device driven inertial interference compensation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9880193
SERIAL NO

13836452

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Techniques for compensating for inertial and/or magnetic interference in a mobile device are provided. The mobile device can include a vibration motor to vibrate the device, a processor, and can include an inertial sensor and/or a magnetometer. The processor can be configured to actuate the vibration motor to induce vibration of the mobile device, to measure motion of the mobile device with the inertial sensor of the device to produce sensor output data and/or to measure a magnetic field generated by the vibration motor to produce magnetometer output data, and to compensate for the vibration of the inertial sensor induced by the vibration motor to produce compensated sensor output data and/or to compensate for a magnetic field generated by the vibration motor when the vibration motor is actuated to produce compensated magnetometer output data.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • QUALCOMM INCORPORATED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Czompo, Joseph Santa Clara, US 51 643
Puig, Carlos Manuel Santa Clara, US 10 114
Riley, Wyatt Thomas Chesterbrook, US 45 794

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00