Replacement gate electrode with multi-thickness conductive metallic nitride layers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9881797
SERIAL NO

14149088

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Gate electrodes having different work functions can be provided by providing conductive metallic nitride layers having different thicknesses in a replacement gate scheme. Upon removal of disposable gate structures and formation of a gate dielectric layer, at least one incremental thickness conductive metallic nitride layer is added within some gate cavities, while not being added in some other gate cavities. A minimum thickness conductive metallic nitride layer is subsequently added as a contiguous layer. Conductive metallic nitride layers thus formed have different thicknesses across different gate cavities. A gate fill conductive material layer is deposited, and planarization is performed to provide multiple gate electrode having different conductive metallic nitride layer thicknesses. The different thicknesses of the conductive metallic nitride layers can provide different work functions having a range of about 400 mV.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jagannathan, Hemanth Guilderland, US 258 2175
Paruchuri, Vamsi K New York, US 83 1713

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00