Semiconductor device including Fin-FET and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9882029
SERIAL NO

15208393

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device includes a first fin structure for a first fin field effect transistor (FET). The first fin structure includes a first base layer protruding from a substrate, a first intermediate layer disposed over the first base layer and a first channel layer disposed over the first intermediate layer. The first fin structure further includes a first protective layer made of a material that prevents an underlying layer from oxidation. The first channel layer is made of SiGe, the first intermediate layer includes a first semiconductor (e.g., SiGe) layer disposed over the first base layer and a second semiconductor layer (e.g., Si) disposed over the first semiconductor layer. The first protective layer covers side walls of the first base layer, side walls of the first semiconductor layer and side walls of the second semiconductor layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsu, Chia-Jung Hsinchu, TW 96 449
Hsu, Tzu-Hsiang Hsinchu, TW 32 81
Huang, Gin-Chen Hsinchu, TW 33 1598
Tsai, Teng-Chun Hsinchu, TW 267 2334
Yang, Feng-Cheng Hsinchu, TW 224 586

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00