Semiconductor device and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9882062
SERIAL NO

14922862

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A first oxide insulating film is formed over a substrate. After a first oxide semiconductor film is formed over the first oxide insulating film, heat treatment is performed, so that hydrogen contained in the first oxide semiconductor film is released and part of oxygen contained in the first oxide insulating film is diffused into the first oxide semiconductor film. Thus, a second oxide semiconductor film with reduced hydrogen concentration and reduced oxygen defect is formed. Then, the second oxide semiconductor film is selectively etched to form a third oxide semiconductor film, and a second oxide insulating film is formed. The second oxide insulating film is selectively etched and a protective film covering an end portion of the third oxide semiconductor film is formed. Then, a pair of electrodes, a gate insulating film, and a gate electrode are formed over the third oxide semiconductor film and the protective film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEMICONDUCTOR ENERGY LABORATORY CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yamazaki, Shunpei Setagaya, JP 7291 227067

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00