Ferritic stainless steel sheet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9885099
SERIAL NO

14384121

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To provide a ferritic stainless steel sheet which has high scale spalling even at a high temperature around 1000° C. Provided is a ferritic stainless steel sheet having excellent Mn-containing oxide film-forming ability and scale spalling ability, containing, in terms of mass %: C: 0.001 to 0.020%, N: 0.001 to 0.020%, Si: 0.10 to 0.40%, Mn: 0.20 to 1.00%, Cr: 16.0 to 20.0%, Nb: 0.30 to 0.80%, Mo: 1.80 to 2.40%, W: 0.05 to 1.40%, Cu: 1.00 to 2.50%, and B: 0.0003 to 0.0030%, in which the above-mentioned components are contained satisfying the formula (1) below, and the balance is composed of Fe and inevitable impurities. At least one of N, Al, V, Mg, Sn, Co, Zr, Hf, and Ta may be added in a predetermined content range.

description='In-line Formulae' end='lead'3≦(5×Mo)/(3×Mn)≦20  (1)description='In-line Formulae' end='tail'

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL & SUMIKIN STAINLESS STEEL CORPORATIONCHIYODA-KU TOKYO 100-0004

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hamada, Junichi Tokyo, JP 66 242
Inoue, Yoshiharu Tokyo, JP 60 771
Kanno, Norihiro Tokyo, JP 13 47

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00