High-pressure fuel pump actuator used in engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9885330
SERIAL NO

15361017

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A high-pressure fuel pump actuator used in an engine, which is used in a fuel injection system of an engine, is mounted on between a driving cam and a fuel pump plunger. The pump actuator includes a guide sleeve, a U-shaped holder, and a pin shaft roller set. The U-shaped holder is formed by stamping the steel plate integrally. The guide sleeve uses a special windowing manner. Both ends of the pin shaft do not need riveting. The structure of the present invention has less number of parts and integrated functions, which can notably reduce the entire weight, the inertial force, the friction, and the abrasion. The operation is steady. The efficiency of the engine is improved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HANGZHOU XZB TECH CO LTDBUILDING 1-5 NO 18 LONGTAN ROAD CANGQIAN STREET YUHANG DISTRICT HANGZHOU CITY ZHEJIANG PROVINCE 311100 HANGZHOU CITY ZHEJIANG PROVINCE 311100

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Xu, Na Hangzhou, CN 34 70

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00