Optical modulator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9885889
SERIAL NO

15468117

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical modulator includes a first optical modulation section and a second optical modulation section which use modulation signals different from each other when applying a modulation signal to the modulation electrode and performing optical modulation. In addition, a light-receiving element is disposed on a substrate, and the light-receiving element has a first light-receiving section that detects optical signal propagating from a first waveguide which guides the optical signal output from the first optical modulation section. In addition, the light-receiving element also has a second light-receiving section that detects an optical signal propagating through a second waveguide which guides the optical signal output from the second optical modulation section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO OSAKA CEMENT CO LTDTOKYO 105-8641

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Katou, Kei Tokyo, JP 28 261
Miyazaki, Norikazu Tokyo, JP 106 218
Shimizu, Ryo Tokyo, JP 116 597

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00