Process for production of magnetic thin film, magnetic thin film, and magnetic material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9886978
APP PUB NO 20120100064A1
SERIAL NO

13378730

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a process for production of a magnetic thin film which has insulation properties, serves as a permanent magnet, and has improved residual magnetization in comparison with prior arts, the magnetic thin film, and a magnetic material. When a magnetic thin film 3 is formed, an external magnetic field with a predetermined intensity is applied to a coating liquid containing magnetic particles containing epsilon-type iron-oxide-based compounds which have insulation properties and which serve as a permanent magnet, and the coating liquid is let cured in order to form the magnetic thin film 3. Accordingly, the magnetic particles containing the epsilon-type iron-oxide-based compounds can be fixed while being oriented regularly in a magnetization direction. This realizes the process for production of the magnetic thin film 3 which has insulation properties and which serve as a permanent magnet, the magnetic thin film 3, and a magnetic material 1.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOWA ELECTRONICS MATERIALS CO LTD4-14-1 SOTOKANDA CHIYODA-KU TOKYO 1010021 ?1010021

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Namai, Asuka Tokyo, JP 23 114
Ohkoshi, Shin-Ichi Tokyo, JP 38 198
Takami, Kazuyuki Tokyo, JP 4 53
Tomita, Koutaro Tokyo, JP 1 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00