Toy building block robot and main control box thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9889388
SERIAL NO

15396381

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A toy building block robot and a main control box thereof are disclosed. The main control box comprises a toy building-block robot main control housing, a toy building-block robot main control board, and a battery. The toy building-block robot main control board is installed in the toy building-block robot main control housing. The battery is connected to the toy building-block robot main control board, so as to supply power to the toy building-block robot main control board. A plurality of connection mechanisms are disposed on the toy building-block robot main control housing for engaging the toy building-block robot main control housing with other components of the toy building block robot. In the present disclosure, whether the assembly of the components in the main control box, or the engagement between the main control box and other components of the toy building block robot, can both be realized through a connection mechanism.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • UBTECH ROBOTICS CORP.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Lefeng Shenzhen, CN 24 106
Wu, Yumiao Shenzhen, CN 20 52
Xing, Dingkai Shenzhen, CN 16 57

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00