Method for blocking an optical lens component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9889535
SERIAL NO

14652437

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lens blocking/deblocking method/device to adhere an ophthalmic lens to a lens holding block A method for blocking an optical lens component (100) on holding unit (200) having bottom part (230) inserted and fixed in lens machining tool (400) and an upper part (250) having upper assembling surface (210) and external side parts (241). The method provides the optical lens component (100) with layer (320) of one-side adhesive tape arranged on bottom of component (100) to cover at least partially bottom (120); (S20) providing thermoplastic material on upper assembling surface (210). The thermoplastic material is heated where a part thereof flows under moderate pressure; (S30) placing the optical lens (100) with layer (320) on thermoplastic material when the thermoplastic is softened; (S40) applying pushing force (P1) on the optical lens (100), to spread the thermoplastic between layer (320) and upper assembling surface (210) and covers external side parts (241).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ESSILOR INTERNATIONAL (COMPAGNIE GENERALE D'OPTIQUE)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Felten, Yohann Charenton le Pont, FR 15 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00