Hybrid wheel loader

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9890517
SERIAL NO

15021806

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid wheel loader includes a control device (200) that estimates output power of an engine (1) and an electricity storage device (11) when the hybrid wheel loader is inferred on the basis of output values of detectors (62, 63) to be traveling towards an object of excavation in order to perform an excavating work, and then, if the output power is less than target power considered necessary for the excavating work, accelerates the engine (1) to a target revolution speed while increasing the electric power supplied from the electricity storage device to a traveling motor (9). Accordingly, power necessary for excavation can be drawn from the engine even when the engine revolution speed is low and there is a fear of power deficiency occurring at the time of the excavating work.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI CONSTRUCTION MACHINERY CO LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ikimi, Takashi Tsuchiura, JP 41 485
Itou, Noritaka Tsuchiura, JP 11 71
Kaneko, Satoru Tokyo, JP 126 2165
Sekino, Satoshi Tsuchiura, JP 21 124

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00