Combined heat and power system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9891003
SERIAL NO

14936174

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A CHP system includes a combustor as a heat source, a Rankine cycle apparatus, a second heat exchanger, and a thermal fluid flow path. The Rankine cycle apparatus includes, as an evaporator, a first heat exchanger that absorbs thermal energy from combustion gas (thermal fluid). The second heat exchanger absorbs thermal energy from the combustion gas and transfers the thermal energy to a heat medium. The first heat exchanger and the second heat exchanger are disposed in the thermal fluid flow path. The thermal fluid flow path includes a first flow path that allows the combustion gas to reach the first heat exchanger directly from the combustor and a second flow path that allows the combustion gas to reach the second heat exchanger directly from the combustor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD22-6 MOTO-MACHI KADOMA-SHI OSAKA 5710057 ?5710057

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hikichi, Takumi Osaka, JP 51 215
Kido, Osao Kyoto, JP 37 297
Kosuda, Osamu Osaka, JP 24 98
Okaichi, Atsuo Osaka, JP 68 264

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00