Multilayer sheet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9891368
SERIAL NO

14782846

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer sheet includes a first resin layer, a second resin layer, a particle-containing layer disposed at least between the first and second resin layers and including plural particles and gaps formed between the particles, and an intermediate layer disposed at least one selected from between the first resin layer and the particle-containing layer or between the second resin layer and the particle-containing layer, including a copolymer having a weight average molecular weight (Mw) of 300,000 or more and a molecular weight distribution, expressed as a ratio of the weight average molecular weight (Mw) to a number average molecular weight (Mn), of 6.0 or less and a structural moiety derived from a crosslinking agent adapted to crosslink the copolymer, and having a crosslinking density of from more than 0 mol/m3 to 450 mol/m3.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NIPPON CARBIDE INDUSTRIES CO., INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imagawa, Ippei Namerikawa, JP 6 11
Mimura, Ikuo Uozu, JP 48 631
Musashi, Naoki Namerikawa, JP 15 18
Uchijima, Ichiro Namerikawa, JP 1 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00