Dynamically updating hardware prefetch trait to exclusive or shared in multi-memory access agent system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9891916
SERIAL NO

14624981

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hardware data prefetcher is comprised in a memory access agent, wherein the memory access agent is one of a plurality of memory access agents that share a memory. The hardware data prefetcher includes a prefetch trait that is initially either exclusive or shared. The hardware data prefetcher also includes a prefetch module that performs hardware prefetches from a memory block of the shared memory using the prefetch trait. The hardware data prefetcher also includes an update module that performs analysis of accesses to the memory block by the plurality of memory access agents and, based on the analysis, dynamically updates the prefetch trait to either exclusive or shared while the prefetch module performs hardware prefetches from the memory block using the prefetch trait.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • VIA TECHNOLOGIES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Greer, John Michael Austin, US 21 361
Hooker, Rodney E Austin, US 140 2661
Loper, Albert J Austin, US 17 281
Ramani-Augustin, Meera Austin, US 2 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00