Solid electrolytic capacitor containing a pre-coat layer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9892862
SERIAL NO

14266912

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solid electrolytic capacitor that contains an anode body formed from an electrically conductive powder, dielectric located over and/or within the anode body, an adhesion coating overlying the dielectric, and a solid electrolyte overlying the adhesion coating is provided. The powder has a high specific charge and in turn a relative dense packing configuration. Despite being formed from such a powder, the present inventors have discovered that the conductive polymer can be readily impregnated into the pores of the anode. This is accomplished, in part, through the use of a discontinuous precoat layer in the adhesion coating that overlies the dielectric. The precoat layer contains a plurality of discrete nanoprojections of a manganese oxide (e.g., manganese dioxide).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AVX CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aoki, Kiyofumi Shiga Pref., JP 12 98
Inazawa, Koji Shiga Pref., JP 4 5
Noborio, Hiromasa Shiga Pref., JP 3 4
Tatsuno, Junya Shiga Pref., JP 3 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00