Brushless motor with cog-shaped rotor core having poles with auxiliary magnets and shaft-fixing portions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9893576
SERIAL NO

15294415

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A brushless motor includes a first rotor core, a second rotor core, and a field magnet member. The first rotor core includes primary projecting pieces arranged along a circumferential direction at equal intervals. The second rotor core has the same shape as the first rotor core, and includes secondary projecting pieces arranged along the circumferential direction at equal intervals. The secondary projecting pieces are positioned between the primary projecting pieces that are adjacent to one another in the circumferential direction. The field magnet member is arranged between the first rotor core and the second rotor core. The field magnet member is magnetized along an axial direction to generate primary magnetic poles in the primary projecting pieces, and generate secondary magnetic poles in the secondary projecting pieces. A rotor includes the first rotor core, the second rotor core, and the field magnet member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ASMO CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mikami, Koji Kosai, JP 54 404
Yamada, Yoji Hamamatsu, JP 97 958

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00