Multi-level step-up converter topologies, control and soft start systems and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9893622
SERIAL NO

15593685

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-level, step-up converter circuit includes an inductor including one terminal in communication with an input voltage supply. N transistor pairs are connected in series, where N is an integer greater than one. First and second transistors of a first pair of the N transistor pairs are connected together at a node. The node is in communication with another terminal of the inductor. Third and fourth transistors of a second pair of the N transistor pairs are connected to the first and second transistors, respectively. (N−1) capacitors have terminals connected between the N transistor pairs, respectively. An output capacitor has a terminal in communication with at least one transistor of the N transistor pair.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MAXIM INTEGRATED PRODUCTS, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Belch, Mark Anthony Chandler, US 5 95
Harrington, David North Chelmsford, US 31 1925
King, Jonathan Brookline, US 51 385
Miwa, Brett A Wellesley, US 20 187
Zhak, Serhii Mikhailovich North Andover, US 5 77

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00