Electric power devices with automatically established input voltage connection configuration

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9893644
SERIAL NO

15351817

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Electric power devices and control methods are provided which automatically select a line voltage or phase voltage of an AC voltage supply. The electric power device includes a switchable circuit, a sensor and a switch control. The switchable circuit connects to the AC voltage supply, and includes multiple switchable elements. The sensor ascertains a voltage level of the AC voltage supply, and the switch control automatically establishes a configuration of the switchable circuit through control of the multiple switchable elements. The switch control couples the electric power device in a line-line (delta) configuration to the AC voltage supply when the voltage level is in a first voltage range, and a line-neutral (wye) configuration when the voltage level is in a second voltage range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahladas, Steven J Poughkeepsie, US 18 131
Covi, Kevin R Glenford, US 23 219
Jenkins, Luke L Poughkeepsie, US 8 5
Schlak, Robert B Hyde Park, US 25 106

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00