Preamble and payload for high efficiency (HE) transmission

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9893790
SERIAL NO

15469470

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In wireless communications, an access point may send a trigger frame to multiple stations. The trigger frame's payload may include a first content and a second content, where the first content is associated with a legacy signal field of an uplink frame, and the second content is associated with a non-legacy signal field of the uplink frame. In response to the trigger frame, one or more stations may generate the uplink frame(s) based on the trigger frame and transmit the uplink frame(s) to the access point. The uplink frame(s) may include a legacy signal field and a non-legacy signal field. The legacy field may include a length of the uplink frame(s) that is based on the first content. The non-legacy signal field may include a remaining transmission opportunity (TXOP) duration that is generated based on the second content. Other methods, apparatus, and computer-readable media are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ATLAS GLOBAL TECHNOLOGIES LLC6136 FRISCO SQUARE BLVD SUITE 400 FRISCO TX 75034

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kwon, Young Hoon Laguna Niguel, US 245 3047
Lee, Daewon Irvine, US 239 3856
Moon, Sungho Irvine, US 116 1737
Noh, Yujin Irvine, US 142 1490

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00