Fluid delivery system, fluid path set, and pressure isolation mechanism with hemodynamic pressure dampening correction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9895527
SERIAL NO

14672885

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pressure isolation mechanism including a valve housing which defines a first lumen associated with a pressurizing device, a second lumen associated with an input line which connects a low pressure fluid delivery system to the valve housing, and a pressure isolation port is disclosed. The pressure isolation mechanism further includes a first valve having a normally open position permitting fluid communication between the first lumen and the second lumen and movable to a closed position when fluid pressure in the first lumen reaches a predetermined pressure level, and a second valve disposed within the second lumen and regulating fluid flow through the second lumen, wherein the second valve substantially isolates the input line from a pressure transducer connected to the pressure isolation port. A method for correcting for dampened hemodynamic blood pressure signals in a fluid delivery system which includes the pressure isolation mechanism is also described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BAYER HEALTHCARE LLC;MEDRAD'

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dedig, James A Pittsburgh, US 28 1001
Grubic, Herbert M Pittsburgh, US 18 631
Haury, John A Sewickley, US 38 1695
Spohn, Michael A Fenelton, US 75 3048

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00