Method for controlling circulation rate of solids in an interconnected fluidized bed

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9895647
SERIAL NO

14731598

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a method for dynamically controlling the circulation rate of solids in an interconnected fluidized bed. When an interconnected fluidized bed is operating, it is available to control the circulation rate of solids by adopting the steps of adjusting the height difference between the orifice on the weir and the bottom surface of the bed region, adjusting the cross-sectional area of the above orifice, or adjusting the height of the above weir. By using multiple ways, the circulation rate of solids can be improved substantially. In addition, the curve of circulation rate of solids can be converged to the maximum circulation rate of solids effectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INSTITUTE OF NUCLEAR ENERGY RESEARCH ATOMIC ENERGY COUNCIL EXECUTIVE YUAN R O CTAOYUAN CITY 32546

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Po-Chuang Taoyuan County, TW 13 19
Chyou, Yau-Pin Taoyuan County, TW 41 282
Hsu, Hung-Te Taoyuan County, TW 2 4
Wu, Keng-Tung Taichung, TW 5 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00