Load-handling means for a tower or a tower section of a wind turbine and method for erecting a wind turbine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9896310
SERIAL NO

15004077

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a load-handling means for a tower or a tower section of a wind turbine, which load-handling means has tower-attachment means for attachment to an upper end or in the region of an upper end of a tower or a tower section of a wind turbine, and attachment points for attaching at least one anchoring means of a lifting gear unit. The invention also relates to a method for erecting a wind turbine, in particular an offshore wind turbine. The load-handling means according to the invention includes at least one oscillation damper, or at least one oscillation damper is attached, in particular releasably and/or exchangeably, to the load-handling means, the damping frequency of which oscillation damper lies in the region of a natural frequency of a clamped or freestanding tower or tower section without a gondola.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH20097 HAMBURG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Seidel, Marc Osnabrück, DE 10 147

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00