Moving bed biofilm reactor for waste water treatment system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9896363
SERIAL NO

15085993

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one embodiment, a method includes receiving wastewater having a first total organic carbon (TOC) at a wastewater treatment system comprising a reactor system, wherein the reactor system comprises an anaerobic moving bed biofilm reactor (MBBR) and an aerobic MBBR. The method further includes treating the wastewater in the anaerobic MBBR, wherein the anaerobic MBBR comprises first bio-carriers configured to degrade at least a portion of the first TOC in the wastewater to generate a first treated wastewater and biogas, wherein the first treated wastewater has a second TOC that is less than the first TOC. The method also includes providing the biogas to an external system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HEADWORKS BIO INC11000 BRITTMOORE PARK DR HOUSTON TX 77041

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Angappan, Siva Victoria, CA 2 14
Nair, Ranjit Houston, US 3 96
Oleszkiewicz, Jan Winnipeg, CA 9 47
Reimers, Robert S Houston, US 14 278
Seidl, Gerald Houston, US 14 58
Tanneru, Charan Tej Houston, US 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00