Methods of upgrading biooil to transportation grade hydrocarbon fuels

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9896390
SERIAL NO

14295857

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to the field of biomass derived fuels. It further relates to thermochemical production of liquids (biooils) from biomass. Specifically the present invention relates to methods of upgrading biooil. More specifically it relates to a method for upgrading biooil comprising contacting a dispersed mixture of hydrocarbon liquids, biooil, and partially upgraded biooil, with a transition metal containing catalyst and hydrogen gas at a temperature of around 330° C. and a pressure of about 1700 psi (11.7 MPa) for a period of time sufficient to reduce the oxygen content of the biooil such that it separates on cooling into an aqueous phase and an organic phase, and optionally, to further subject the organic phase to hydrotreating, hydrocracking or catalytic cracking to produce a mixture of hydrocarbons boiling in the range of gasoline, diesel and jet fuel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IFP ENERGIES NOUVELLES;DYNAMOTIVE ENERGY SYSTEMS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Quignard, Alain Roussillon, FR 18 300
Radlein, Desmond Waterloo, CA 6 404

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00