Method for producing 2-methylbutyric acid having a reduced content of 3-methylbutyric acid from the secondary flows arising in the production of pentanoic acids

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9896406
SERIAL NO

15033767

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for preparing 2-methylbutyric acid having a reduced content of 3-methylbutyric acid from the secondary streams obtained in the preparation of pentanoic acids, includes generating a stream enriched with 2-methylbutanal and 3-methyl-butanal. The stream enriched with 2-methylbutanal and 3-methylbutanal of step is reacted with formaldehyde. The reaction with formaldehyde is followed by removal of the organic phase and selective hydrogenation in the presence of a hydrogenation catalyst with hydrogen at elevated temperature and elevated pressure and, after removal of the hydrogenation catalyst, treatment of the hydrogenation output obtained with an oxidizing agent.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OXEA GMBH46147 OBERHAUSEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Strutz, Heinz Moers, DE 71 219
Theuerkauf, Jens Krefeld, DE 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00