Coating, coating system, and coating method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9896585
APP PUB NO 20160102212A1
SERIAL NO

14509566

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A coating, a coating system, and a coating method are provided. The coating includes between about 0.25-35% filler particles embedded in a chrome phosphate binder matrix comprising a balance of the coating by volume. The filler particles have a size in the range from nanosize to six microns with an aspect ratio of from 1:1 to 3:1, and include up to 100% by weight lubricious particles with a balance hard particles. The lubricious particles are selected from the group consisting of boron nitride (BN), titanium nitride (TiN), titanium oxide (TiO2), zinc (Zn), tin (Sn), oxides of zinc and tin, and combinations thereof. The hard particles are selected from the group consisting of chromium carbide (CrC), tungsten carbide (WC), silicon (Si), aluminum (Al), oxides or nitrides of silicon and aluminum, and combinations thereof. A green slurry coating includes an evaporable solvent mixed with the filler particles and chrome phosphate binder matrix.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anand, Krishnamurthy Karnataka, IN 55 499
Pabla, Surinder Singh Greer, US 59 311

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00