Hybrid construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9896822
SERIAL NO

15021375

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid construction machine which can improve temperature control efficiency of an electrical storage device. It includes an engine 1, an assisting electricity generation motor 2 which performs assistance of power for the engine 1 and electricity generation and an electrical storage device 8 which performs transfer of electric power with this assisting electricity generation motor 2. The electrical storage device 8 includes a plurality of battery cells 200, a housing 220 which covers the plurality of battery cells 200 in a state of leaving them separated, a cooling plate 203 which is attached to this housing 220 and performs heat exchange with the plurality of battery cells 200, and a projection 214 which is interposed between the housing 220 and the cooling plate 203 and hinders heat transfer between the housing 220 and the cooling plate 203.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HITACHI CONSTRUCTION MACHINERY CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kohno, Ryuji Tokyo, JP 107 2429
Takeuchi, Ken Tsuchiura, JP 169 6287
Yoshihara, Shigeyuki Tsuchiura, JP 25 512

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00