Recycling constant-temperature ceramic floor integrated system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9896843
SERIAL NO

14894351

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various embodiments may relate to a recycling constant-temperature ceramic floor integrated system, including a floor tile. A plurality of grooves is formed in a bottom surface of the floor tile. The bottom surface of the floor tile is connected to a base plate. A support assembly is laid between each groove and the base plate. The support assembly includes a heat conducting piece and a locating support mounted in up-and-down lapping mode. A reflecting film is disposed between the heat conducting piece and the locating support. The base plate uses a net-structure plate piece, and buckle grooves and buckle blocks are disposed at the periphery of the base plate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJIAN LOPO TERRACOTTA PANELS MANUFACTURING CO LTD363900 ANCIENT AGRICULTURAL SILVER POND INDUSTRIAL PARK CHANGTAI ECONOMIC DEVELOPMENT ZONE ZHANGZHOU FUJIAN ZHANGZHOU CITY FUJIAN PROVINCE 363900

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Peng, Xinghua Quanzhou, CN 2 4
Wu, Jinyi Xiamen, CN 7 11
Zhang, Mousen Quanzhou, CN 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00