Hybrid electric generation plant fed by sources of a fossil/solar origin

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9896916
SERIAL NO

14396015

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to an electric generation plant (110) of the type without connection to an distributed electric supply network for generating an alternating electric current destined for a plurality of utilities (105) comprising: a first generator (101) fed with fuel of a fossil origin for generating a first alternating electric current in continuous service, i.e. 24 hours a day; a second photovoltaic generator (102) for generating a second direct electric current by conversion of solar radiation comprising a plurality of inverters (106) of the distributed type for inverting and regulating said current; an electric feeding panel (103) of the power motor control center type fed by said first and second current; an energy management system (104) for regulating said first generator (101) in relation to the electric current generated by said second generator (102) and load requirements of possible electric utilities (105); a resistor (107) for preventing the inlet of electric currents in the first generator (101) potentially dangerous for the same. A further object of the present invention relates to an isolated electric system (100) comprising an electric generation plant (110) as described above for feeding a plurality of electric utilities (105).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENI S P A00144 ROME

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brocco, Valerio Rome, IT 1 3
Ferrari, Marco Tavazzano, IT 46 736
Fiore, Nicola Vignate, IT 4 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00