Control system for hybrid construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9897119
SERIAL NO

14432636

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control system for a hybrid construction machine includes a turning-regeneration-use switching valve that opens when a pressure detected by a pressure detector reaches a turning-regeneration starting pressure, so as to introduce the working fluid from a turning circuit to a regenerative motor, an operating-state detector that detects an operating state of a fluid pressure cylinder; and a cylinder-regeneration-use switching valve that opens based on a detection result of the operating-state detector, so as to introduce the working fluid from the fluid pressure cylinder to the regenerative motor. When the turning regeneration is performed alone, the working fluid from the turning circuit is introduced into the regenerative motor without pressure reduction, When the turning regeneration and the cylinder regeneration are simultaneously performed, the working fluid from the turning circuit is reduced in pressure, joins the working fluid from the fluid pressure cylinder, and is introduced into the regenerative motor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KYB CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Egawa, Masahiro Saitama, JP 37 168
Kawasaki, Haruhiko Kanagawa, JP 40 229

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00