Control system in an industrial gas pipeline network to satisfy energy consumption constraints at production plants

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9897260
SERIAL NO

15490308

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Controlling flow of gas in an gas pipeline network, wherein flow of gas within each of the pipeline segments is associated with a direction (positive or negative). Processors calculate minimum and maximum production rates (bounds) at the gas production plant to satisfy an energy consumption constraint over a period of time. The production rate bounds are used to calculate minimum and maximum signed flow rates (bounds) for each pipeline segment. A nonlinear pressure drop relationship is linearized to create a linear pressure drop model for each pipeline segment. A network flow solution is calculated, using the linear pressure drop model, comprising flow rates for each pipeline segment to satisfy demand constraints and pressures for each of a plurality of network nodes over the period of time to satisfy pressure constraints. The network flow solution is associated with control element setpoints used to control one or more control elements.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AIR PRODUCTS AND CHEMICALS, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Esmaili, Ali Emmaus, US 15 176
Isom, Joshua David Allentown, US 10 22
Latshaw, Catherine Catino Fogelsville, US 9 27
Mancilla, Camilo Allentown, US 5 15
Smith,, IV Oliver Jacob New Tripoli, US 3 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00