Automatic probe construction system and method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9898257
SERIAL NO

15016120

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An automatic probe construction system and the method thereof are provided. The automatic probe construction system includes a data dereference analysis module, a probe selection module, and a probe verification module. The data dereference analysis module dereferences a plurality of target data of an electronic apparatus according to a plurality of pointers, and constructs a plurality of candidate probes. The probe selection module constructs a control flow graph according to the candidate probes and an instruction code of an executable image file, to select via the control flow graph from the candidate probes at least one dedicated probe. The probe verification module searches the executable image file for an instruction code corresponding to the dedicated probe, to verify the dedicated probe. Therefore, the dedicated probe can be constructed automatically, and the number of the dedicated probes is thus limited.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NATIONAL CHIAO TUNG UNIVERSITY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsu, Chia-Wei Hsinchu, TW 62 208
Shieh, Shiuhpyng Hsinchu, TW 3 39
Wang, Chi-Wei Hsinchu, TW 10 70
Wang, Chia-Wei Hsinchu, TW 146 2052

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00