Weighted periodic scheduling of a shared resource

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9900903
SERIAL NO

14595999

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Packets received by a network device are assigned to packet flows defined by shared packet characteristics. The packet flows belong to a first category containing packet flows that are to be granted access to the shared resource periodically and with a fixed time interval between subsequent grants of access to the shared resource, or a second category containing packet flows not included in the first category. A periodic schedule that allocates the shared resource to the packet flows in the first category is determined. The periodic schedule includes one or more empty time slots during which the shared resource is not granted to any packet flow in the first category. Access to the shared resource is granted to packet flows in the first category according to the periodic schedule, and is granted packet flows in the second category during the empty time slots in the periodic schedule.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MARVELL ISRAEL (M.I.S.L.) LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rottenstreich, Ori Kiriat Motzkin, IL 6 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00