Rear grain cart grain handling assemblies for an agricultural harvesting combine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9901030
SERIAL NO

14946842

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a grain harvesting articulated combine of a forward PPU, a rear grain cart, and an articulation joint that connects the forward PPU with the rear grain cart. The rear grain cart includes an ascending lift auger assembly that receives clean grain from the forward PPU and transports it upwardly for dumping into the rear grain cart. A generally horizontal drag auger assembly moves clean grain to a lower a lift auger assembly. A clean grain off-loading auger assembly is connected to the lower lift auger assembly by a slew bearing. The clean grain off-loading auger is retractable about its upper end and its upper end assembly is terminated with a spout adapted to direct clean grain generally downwardly. The clean grain off-loading auger assembly is rotatable from a grain off-loading position to a home position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TRIBINE INDUSTRIES LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baber, Roger Galvaston, US 5 11
Dillon, Ben N Logasport, US 38 415
Herrman, Reinhold A Manhattan, US 3 7
Matousek, Robert A Valley Center, US 151 2168

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00