Method for preparing R-Fe-B based sintered magnet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9901984
SERIAL NO

14187197

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for preparing an R—Fe—B based sintered magnet. The method includes: 1) preparing a R1—Fe—B-M alloy, pulverizing the R1—Fe—B-M alloy to yield a R1—Fe—B-M alloy powder, adding a heavy rare earth powder of R2 or R2X and subsequently adding a lubricant to the R1—Fe—B-M alloy powder and uniformly stirring to form a mixture, where R1 being Nd, Pr, Tb, Dy, La, Gd, Ho, or a mixture thereof; M being Ti, V, Cr, Mn, Co, Ga, Cu, Si, Al, Zr, Nb, W, Mo, or a mixture thereof; R2 being at least one from Tb, Dy, and Ho; X being at least one from O, F, and Cl; 2) pressing the mixture obtained in step 1) to form a compact, and sintering the compact in a pressure sintering device in vacuum or in an inactive gas atmosphere to obtain a magnet; and 3) aging the magnet obtained in step 2).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YANTAI ZHENGHAI MAGNETIC MATERIAL CO LTD264006 NO 9 SHANTOU STREET YANTAI DEVELOPMENT ZONE SHANDONG PROVINCE YANTAI CITY SHANDONG PROVINCE 264006

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Dongdong Yantai, CN 41 159
Peng, Buzhuang Yantai, CN 3 7
Shao, Meizhu Yantai, CN 1 0
Wang, Qingkai Yantai, CN 9 6
Wei, Rui Yantai, CN 7 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00