Method and monitoring device for testing an elevator system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9902592
SERIAL NO

14237390

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A test method is applied to an elevator system having a control unit and at least one bus node. The bus node has a first microprocessor and a second microprocessor and the control unit and the bus node communicate by a bus. Furthermore, the first microprocessor and the second microprocessor are connected without interruption by a signal line. The test method includes the steps: a specification signal is transmitted by the control unit to the first microprocessor, the first microprocessor transmits the signal to the second microprocessor, and the second microprocessor provides the signal for the control unit. Finally, the control unit verifies whether the provided signal corresponds to a signal expected by the control unit. The elevator system includes a monitoring device for carrying out the test method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INVENTIO AG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hess, Martin Baar, CH 74 5764
Michel, David Thalwil, CH 34 587
Sonnenmoser, Astrid Hochdorf, CH 36 177

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00