Hot rolled steel sheet and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9903023
SERIAL NO

14430410

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hot rolled steel sheet consisting of, in mass %, C: 0.05% to 0.15%, Si: 0% to 0.2%, Al: 0.5% to 3.0%, Mn: 1.2% to 2.5%, P: 0.1% or less, S: 0.01% or less, N: 0.007% or less, Ti: 0.03% to 0.10%, Nb: 0.008% to 0.06%, V: 0% to 0.12%, one or more of Cr, Cu, Ni, and Mo: 0% to 2.0% in total, B: 0% to 0.005%, one or more of Ca, Mg, La, and Ce: 0% to 0.01% in total, total amount of Si and Al: 0.8×(Mn−1)% or more, total amount of Ti and Nb: 0.04% to 0.14%, and the balance: Fe and impurities. In a structure of steel, a total area ratio of martensite and retained austenite is 3% to 20%, an area ratio of ferrite is 50% to 96%, and an area ratio of pearlite is 3% or less. In a superficial layer part, the thickness in a sheet thickness direction of a region in which a network-like oxide is present is less than 0.5 μm, and a maximum tensile strength is 720 MPa or more.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATION6-1 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008071 ?1008071

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Itami, Atsushi Tokyo, JP 10 68
Maruyama, Naoki Tokyo, JP 103 708
Seto, Atsushi Tokyo, JP 17 59
Tanahashi, Hiroyuki Tokyo, JP 10 61
Yokoi, Tatsuo Tokyo, JP 52 376

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00