Absorbent article manufacturing apparatus and absorbent article manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9903058
SERIAL NO

15029251

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An absorbent article manufacturing apparatus includes:

    a first conveying route that is arranged in a straight line along a first direction in plan view;a plurality of processing devices that process an intermediate product of an absorbent article that is conveyed along the first conveying route;a heating unit that restores bulk of a non-woven fabric through heating the non-woven fabric by blowing hot air onto the non-woven fabric while conveying the non-woven fabric along a direction in which the non-woven fabric is continuous, the non-woven fabric being a strip shape and serving as a part of the absorbent article; anda second conveying route that conveys the non-woven fabric in a second direction that intersects the first direction in plan view, the non-woven fabric having been restored of the bulk through heating with the heating unit the non-woven fabric being input to the first conveying route via the second conveying route.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • UNI-CHARM CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mitsuno, Satoshi Kagawa, JP 39 681
Okuda, Jun Kagawa, JP 53 371

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00