Integrally cast excavator bucket and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9903093
SERIAL NO

15224621

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides an integrally cast excavator bucket and a manufacturing method thereof. The integrally cast excavator bucket comprises a lifting lug, a top plate, two side plates and a bottom plate connected with the two side plates. A method for manufacturing the integrally cast excavator bucket by adopting the cast steel comprises the following steps: putting cast steel components into a melting furnace, and carrying out modification treatment before furnace after melting is finished; manufacturing models and a template, coating, heating, vacuumizing, placing sandboxes, adding sand, molding, carrying out mold closing, casting, quenching, tempering and cooling to room temperature to finish casting of the excavator bucket. The integrally cast excavator bucket is formed by once casting from a low-alloy steel material by adopting a vacuum sealing technology, and is high in product strength, resistant to wear and corrosion, high in impact resistance and long in service life.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HUBEI WANXIN PRECISION CASTING & FORGING INC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wan, Jiwen Hubei, CN 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00