Tub faucet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9903103
SERIAL NO

15081938

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tub faucet includes a first shell; a second shell; a cross-shaped first coupling including a tubular member having two sets of two opposite wells at two ends respectively, an externally threaded first tube, an externally threaded second tube; two T-shaped second couplings each including an externally threaded inlet, a tubular first joining member, the first joining member having two opposite tabs on an outer surface, and an externally threaded, tubular second joining member; two knobs rotatably secured to the second joining members respectively; and a spout threadedly secured to the second tube, the spout having a stem configured to open or close the spout. The first joining members are secured to two ends of the tubular member respectively with the tabs inserted into the wells respectively. The first and second shells are complimentarily fastened together with the first and second couplings partially disposed therein.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHYI LIOU ENTERPRISE CO LTDNO 382 ZHANGMA ROAD CHANGHUA CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ho, Chin-Hua Changhua, TW 11 122

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00