Oil jet abnormality determination apparatus of internal combustion engine and control apparatus of internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9903254
SERIAL NO

14765441

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An MBT ignition time and a knock ignition time are acquired from an engine rotation speed and engine load, and an ignition time on a delay angle side, out of these ignition times, is set as the most advance angle ignition time. An ignition time on the delay angle side only by the KCS learning value with respect to the most advance angle ignition time is set as a required ignition time, and when an actual ignition time set by a knock control system exceeds a predetermined amount and is positioned on the delay angle side with respect to the required ignition time, it is determined that abnormality occurs in an oil jet. Fail-safe processing to the effect that the opening degrees of a throttle valve are corrected to a closed side is executed in response to the abnormality determination.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHATOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shinagawa, Tomohiro Shizuoka, JP 47 314

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00